About MG EXEO

Built in the Philippines. Backed by global expertise.

MG EXEO Network, Inc. was founded in 1991 in the Philippines with the support of EXEO Group, Inc. of Japan.

01Company overview

Who we are

Since 1991 we have engineered, built and maintained the infrastructure that connects and powers the Philippines — telecom, railway and power.

From telecommunications construction, the company has developed into a multidisciplinary engineering partner for railway, telecom, power and public infrastructure.

We survey, design, build, install, test and maintain — with our own engineers, crews, tools and training center, and with the standards and know-how of EXEO Group.

  • 35years in operationFounded 15 May 1991
  • 549projects since 1992Project register, March 1992 – August 2025
  • 50+clients and main contractorsOperators, vendors, EPCs, government
  • 550+towers erectedCell sites and relay stations
  • 27countries and territoriesOverseas assignments since 1993
  • AAAPCAB licenseGeneral Engineering · No. 16405

Corporate data

Company nameMG EXEO Network, Inc.
Established15 May 1991
Paid-in capitalPHP 75,002,000
GroupMember of EXEO Group, Inc. (Tokyo Stock Exchange Prime: 1951)
Employees210 (October 2026)
BusinessEngineering, construction, installation and maintenance of railway, telecom, power and public infrastructure systems
Contractor licensePCAB AAA · General Engineering · License No. 16405 · valid until 30 April 2027 (first licensed April 1993)
Head officeFalcon Drive (Elizabeth Avenue), Sta. Ana Drive, Sun Valley, 1700 Parañaque City
Corporate office12th Floor, DPC Place Building, 2322 Chino Roces Avenue, 1231 Makati City
Government registration3877-2023
General BuildingElectrical WorksCommunication FacilitiesPHILGEPS Platinum

Vision and mission

Our vision

To utilize the power of engineering to resolve social issues and foster societal progress.

Our mission

To empower the future through boundless engineering, where diverse expertise converges with innovation to unlock extraordinary possibilities.

FUSIONWe envision. We engineer. We connect.

02History

35 years of growth

Telephone networks in the 1990s, mobile and fiber in the 2000s, subsea and training in the 2010s, railway and HV power in the 2020s.

Aerial cable installation in the 1990s
1990sTelephone networks
EX-SSM tower in Bangladesh
2000sMobile networks & towers
MG EXEO Engineering & Training Center
2010sFiber, subsea & training
Wayside signaling works on MRT-3
2020sRailway & power systems
  1. 1991Company foundedEstablished on 15 May 1991 with Marubeni Corporation, Gingua Corporation and Kyowa Exeo Corporation (now EXEO Group) as stockholders.
  2. 1992National Telephone ProgramSwitching and power installation with Sumitomo and NEC — our first project in the register.
  3. 1993PCAB license and first work abroadContractor license approved by PCAB; switching, power, testing and commissioning in Ghana.
  4. 1994PLDT-accredited contractorIncluded in PLDT's list of accredited contractors for telephone installation and outside plant design and engineering.
  5. 1997Fiber backbonePLDT DFON fiber backbone, Visayas–Mindanao: 626 km of trenching.
  6. 2000Tall towersSupply and erection of a 70 m self-supporting tower on a building rooftop, Vito Cruz.
  7. 2001Aviation and first rail workNationwide air navigation facilities; 3,684 anchor bolts for an LRT depot maintenance dock.
  8. 2005Our own tower designThe 44 m EX-SSM self-supporting tower, later supplied for 40 sites in Bangladesh.
  9. 20121,490 km fiber networkGlobe Nemesis outside plant network across NCR, the Visayas and Mindanao (2012–17).
  10. 2017Engineering & Training CenterOur own training center opens at the Sun Valley head office in May 2017.
  11. 2019First rail systems packageFiber optic cable restoration and testing on MRT-3 — 13 stations and depot.
  12. 2025Depot signaling and 69 kVNSCR Mabalacat Depot signaling and communications; 69/13.2 kV substation upgrade with a partner.
  13. 2026Track bed and mock-upsNSCR mainline track bed on viaduct; signaling mock-ups at the Philippine Railways Institute (MMSP).

Today210 employees · PCAB AAA · head office in Parañaque, corporate office in Makati · member of EXEO Group

03Our parent company

Backed by EXEO Group

EXEO Group — listed on the Tokyo Stock Exchange Prime Market and our shareholder since 1991 — stands behind MG EXEO.

EXEO Group net sales

(¥ billion)

+17% YOY
  • 1954founded in Tokyo
  • TSE Primelisted · code 1951
  • 17,751Group employees
  • ¥787.7Bnet sales, FY2025

Group businessesTelecom Carriers · Urban Infrastructure · System Solutions

Sources: EXEO Group Facts and Figures 2026; Integrated Report 2025. FY2025 = April 2025 – March 2026. Employees as of 31 March 2026.

What EXEO Group gives MG EXEO

  1. Ownership and stabilityEXEO Group, Inc. (formerly Kyowa Exeo) has been our shareholder since our founding in 1991 and backs us financially.
  2. Technology, standards and know-howGroup companies share technical resources, standards and engineering expertise with MG EXEO.
  3. Railway references68 selected Group railway references in Japan and Singapore support our technical proposals.
  4. PeopleFrom FY2015 to FY2021, EXEO sent its own trainees to the Philippines — the model for the Group's global trainee program today.

EXEO Group corporate movie — how diverse engineering capabilities connect people, cities and businesses.

04Trusted in Japan

EXEO Group relies on MG EXEO

EXEO Group relies on MG EXEO for engineering work in Japan — proof that we meet Japanese quality standards.

PeriodWorkFor
OngoingRemote inspection of in-home construction work in Japan (access networks)EXEO Group
2022–Construction record photo management system — software development for JapanEXEO Group
2025–Japanese-language and specified-skills training for candidates going to work in JapanEXEO Group
2022–2024Radar surveillance system installation for the Philippine Air Force, La Union and ZamboangaEXEO Group
2022–Open RAN field survey and equipment installation, MakatiEXEO Group / NTT Docomo
2025Solar power system site survey, Manila and CebuEXEO Group / NTT Docomo
Kenji Tanifuji

Kenji TanifujiChief Executive Advisor

05Management greeting

Building a connected, resilient and future-ready Philippines.

“At MG EXEO, we are not just connecting networks—we are connecting lives, opportunities and the future.”

Through trusted partnerships and resilient infrastructure, MG EXEO continues to help shape the future of the Philippines across telecommunications, rail and government initiatives.

We combine international expertise with local empowerment and knowledge transfer to deliver sustainable, adaptable and future-ready solutions.

Board of Directors

  • Arturo B. Diago, Jr.Filipino
  • Kenji TanifujiJapanese
  • Arturo M. HiladoFilipino
  • Satoru TairaJapanese
  • Ricardo D. BautistaFilipino

Key Officers

  • Arturo B. Diago, Jr.Chairman / President
  • Kenji TanifujiChief Executive Advisor
  • Arturo M. HiladoTreasurer
  • Michelle Carisse S. BaloisCorporate Secretary

Shareholding Structure

Work with MG EXEO

Invite us to your next railway, telecom or power package — our prequalification documents are ready on request.