A member of the EXEO GroupTokyo Stock Exchange Prime: 1951PCAB AAA licensed contractor

corp.offices@mgexeo.com.ph
North–South Commuter Railway viaduct under construction

North–South Commuter Railway viaduct under construction, Central Luzon, 2025

Railway Systems & Infrastructure

A railway delivery partner on four Philippine rail systems

Power, signaling, telecom, track and civil works for rail systems contractors, EPCs and project owners — backed by proven engineering and EXEO Group railway know-how.

MRT-3 · LRT-1 · NSCR · MMSPRailway packages since 2019

  • 4rail systemsMRT-3 · LRT-1 · NSCR · MMSP
  • 10+railway packagesSince 2019
  • 14railway service areasPower · signaling · telecom · track · civil · support
  • 68EXEO Group railway referencesJapan 55 · Singapore 13

01Why MG EXEO

Why MG EXEO for railway packages

Local rail experience + proven adjacent engineering + local resources + EXEO Group know-how = a credible railway delivery partner.

Local rail experience

4 rail systems

MRT-3 · LRT-1 · NSCR · MMSP

  • 10+ packages since 2019
  • For international rail systems contractors and suppliers
  • Signaling, telecom, power, depot and track works

Proven adjacent engineering

549 projects

Telecom · power · civil

  • 2,100+ km fiber backbone
  • 550+ towers, up to 70 m
  • 69 kV substation; radar and air navigation systems

Local resources & execution

PCAB AAA

General Engineering license

  • 210 staff; Parañaque base with training center
  • Own vehicles, tools and GPS-tracked fleet
  • Night works on an operating line (MRT-3)

EXEO Group railway know-how

68 references

Japan 55 · Singapore 13

  • Japan: CBTC fiber, ATC, control center works
  • Singapore: signaling, 22 kV power, trainborne systems
  • Selected references; 17,751 people in the Group
A CREDIBLE RAILWAY DELIVERY PARTNERInvite MG EXEO to bid for: OCS · traction and station power · station systems and PSD · SCADA and control cabling · signaling and communications · track, trackform and civil works · testing, commissioning and maintenance

02Railway footprint

Ten packages on four rail systems since 2019

On operating lines and on new lines under construction — for international systems, signaling, telecom and track contractors.

  • MRT-3EDSA, Metro ManilaOperating line
    • 2019–21Fiber optic cable restoration and testing — 13 stations and depotTelecom
    • 2024–25Signaling fiber, cable trays and troughs — UGCS and Taft pocket trackSignaling
    • 2025Wayside signaling cables; LV power, UPS for signaling power, groundingSignaling · Power
    • 2026–Balise and impedance bond replacement, balise test supportSignaling
  • LRT-1Cavite Extension Phase 1, Metro ManilaOperating line
    • 2023Telecom cable trays; power cable trays at traction substation TPS10Telecom · Power
    • 2023–24Telecom equipment installation for the new stationsTelecom
  • NSCRNorth–South Commuter Railway, Clark–CalambaUnder construction
    • 2024–Fiber survey, communications design, installation drawings, CAD operators, test environmentEngineering · Telecom
    • 2025–Signaling and communications installation, Mabalacat DepotSignaling · Telecom
    • 2026–Mainline track bed on viaduct, CP-04 Malolos–TutubanTrack
  • MMSPMetro Manila SubwayUnder construction
    • 2026Interlocking, fixed-block and railroad model mock-ups, Philippine Railways InstituteSignaling · Track

Source: MG EXEO project records (2019–2026). Also: 3,684 anchor bolts for an LRT depot maintenance dock (2001). Client names withheld for confidentiality; references available on request.

03Service capabilities

14 railway service areas

Each service area is backed by MG EXEO rail delivery, proven adjacent engineering or EXEO Group railway references — open any card for its scope and evidence.

Rail MG EXEO railway deliveryProven MG EXEO telecom, power and civil workEXEO Group EXEO Group railway referencesRail (related work) related rail work

Power & electrification

Traction, station and auxiliary power and the overhead contact system.

01

Traction Power & Substations

Substation equipment, HV and DC cabling, containment

RailProvenEXEO Group
Scope and evidence
  • Cable trays and containment at traction substations
  • HV, MV and DC power cable laying and termination
  • Substation equipment installation and grounding
  • Switchyard and transformer works with licensed partners
  • Pre-commissioning checks and test records
  • Rail

    Power cable trays at traction substation TPS10, LRT-1 Cavite Extension (2023)

  • Proven

    69/13.2 kV substation upgrade, 10/12.5 to 20/25 MVA, with AsiaPhil — TARELCO (2025–)

  • EXEO Group

    Substation facilities, AC/DC converters and 22 kV power cables on two MRT lines, Singapore (2020–22)

02

Station & Auxiliary Power

LV distribution, power cabling, UPS, grounding

RailProvenEXEO Group
Scope and evidence
  • LV distribution boards and power cabling
  • UPS for signaling and telecom power supply
  • Grounding and bonding
  • Power for equipment rooms
  • DC power plants and batteries
  • Rail

    LV power cables and terminations, UPS for signaling power, grounding — MRT-3 (2025)

  • Proven

    DC power plants, rectifiers, batteries, generator sets and LV distribution for telecom, radar and air navigation sites (1997–)

  • EXEO Group

    UPS replacement at 40 subway stations, Tokyo (2020–23)

03

Overhead Contact System (OCS)

OCS foundations, masts and supports, wiring

Rail (related work)ProvenEXEO Group (no reference of this kind)
Scope and evidence
  • Survey and setting-out of mast positions
  • Mast foundations and anchor bolts
  • Mast, portal and cantilever erection
  • Contact and catenary wire installation
  • Bonding and grounding
  • Proven

    550+ towers erected since 1995, up to 70 m; foundations and soil tests; 3,684 anchor bolts set to a fabricated template (LRT depot, 2001)

  • EXEO Group (no reference of this kind)

    No reference of this kind

Signaling, telecom & control

The systems that run trains safely and keep stations connected.

04

Signaling & Train Control

Signaling cables, track-side equipment, balises

RailProvenEXEO Group
Scope and evidence
  • Wayside signaling cable laying, termination and testing
  • Balises, impedance bonds and track-side equipment
  • Signaling fiber optic networks
  • Signal equipment room and interlocking installation
  • Depot signaling
  • Test support to the signaling supplier
  • Rail

    Balise and impedance bond replacement, MRT-3 (2026–); wayside signaling cables and signaling fiber, MRT-3 (2024–25); depot signaling, NSCR (2025–); interlocking mock-ups, Philippine Railways Institute (2026)

  • Proven

    Cable laying, termination and testing at scale: 2,100+ km fiber backbone; equipment at 5,800 sites in one program

  • EXEO Group

    Fiber networks for CBTC on Tokyo subway and commuter lines; ATC equipment; full signaling scope, Singapore Downtown Line 3 Extension

05

Railway Telecommunications

Fiber backbone, radio and data networks, station communications

RailProvenEXEO Group
Scope and evidence
  • Fiber backbone: survey, design, installation, splicing and testing
  • Telecom equipment rooms and station equipment
  • Radio and data networks
  • Station communications: PA, CCTV, passenger information
  • Communications design, drawings and CAD
  • Rail

    Fiber installation and testing, 13 stations and depot, MRT-3 (2019–21); telecom equipment, LRT-1 Extension (2023–24); communications design, NSCR (2024–)

  • Proven

    2,100+ km fiber backbone; DWDM transport; submarine cable stations; mobile radio networks

  • EXEO Group

    Train radio (LCX), 5G sharing and Wi-Fi at all stations, Tokyo area; PA systems and trainborne communications, Singapore

06

SCADA & Control Cabling

Control and monitoring cabling, networks, cubicles

Rail (related work)ProvenEXEO Group
Scope and evidence
  • Control and monitoring cable laying and termination
  • Network switches, racks and cubicles
  • Field device and interface wiring
  • Point-to-point and loop testing
  • Labeling and as-built records
  • Proven

    Core network, telco cloud (NFVI) and data center installations; DWDM networks; racks and cubicles (2019–23)

  • EXEO Group

    Cabling and equipment for a new operation control center, Japan (2019–21)

07

Platform Screen Doors & Station Systems

PSD installation, station communications and electrical

RailProvenEXEO Group
Scope and evidence
  • Platform screen door installation and alignment
  • Anchoring, frames and cabinets
  • Station communications equipment
  • Station electrical systems
  • Interface testing support
  • Rail

    Station telecom equipment, LRT-1 Extension (2023–24); station LV power and UPS, MRT-3 (2025); 3,684 anchor bolts to a fabricated template, LRT depot (2001)

  • Proven

    Precise anchoring, alignment and fit-out of racks, frames and cabinets at exchanges and data centers

  • EXEO Group

    Station telecom works for platform extensions, station renewals and one-person operation, Japan; PA systems, Singapore

Track, civil & depot

Civil work done to systems tolerances — on viaducts, in stations and in depots.

08

Track & Trackform Works

Track bed, plinths, rebar and concrete

RailProvenEXEO Group (no reference of this kind)
Scope and evidence
  • Track bed and plinths: rebar, formwork and concrete
  • Setting-out and survey
  • Resilient pads and fastening installation
  • Track-side cable routes and crossings
  • Inspection and quality records
  • Rail

    Mainline track bed on viaduct, NSCR CP-04 Malolos–Tutuban (2026–); railroad model mock-up, Philippine Railways Institute (2026)

  • Proven

    Civil works at scale: concrete foundations, manholes, concrete-encased ducts; 626 km trenching (1997–98)

  • EXEO Group (no reference of this kind)

    No reference of this kind

09

Civil & Structural Works

Foundations, trenches, duct banks, cable routes

RailProvenEXEO Group
Scope and evidence
  • Equipment foundations and bases
  • Cable trenches, duct banks and crossings
  • Cable troughs and containment
  • Equipment shelters and control buildings
  • Anchor bolts and steel supports
  • Rail

    Cable troughs and trays, MRT-3 (2024–25) and LRT-1 (2023); anchor bolts, LRT depot maintenance dock (2001)

  • Proven

    Tower foundations and control buildings at air navigation sites (2001–03); manhole and duct systems; 626 km trenching

  • EXEO Group

    Cable undergrounding and cable troughs on viaducts, Tokyo-area railways

10

Depot & Railway Facilities

Depot signaling, communications, electrical works

RailProvenEXEO Group (no reference of this kind)
Scope and evidence
  • Depot signaling and communications
  • Equipment room fit-out, power and grounding
  • Workshop and maintenance-dock equipment bases
  • Depot yard cable routes
  • Site set-up and temporary facilities
  • Rail

    Signaling and communications installation, NSCR Mabalacat Depot (2025–); maintenance-dock anchor bolts, LRT depot (2001)

  • Proven

    Equipment rooms, power and grounding at telecom exchanges and data centers

  • EXEO Group (no reference of this kind)

    No reference of this kind

Delivery & support

From installation to handover and maintenance — with engineering support throughout.

11

Installation & Integration

Equipment and cable installation, interfaces

RailProvenEXEO Group
Scope and evidence
  • Equipment and cable installation to the supplier's drawings
  • Termination, labeling and cable dressing
  • Interface coordination with other packages
  • Handling and storage of client-supplied materials
  • Daily progress and inspection records
  • Rail

    Signaling and telecom installation on four rail systems: MRT-3, LRT-1, NSCR and MMSP (2019–)

  • Proven

    Submarine line terminal equipment; telco cloud (NFVI); equipment at 5,800 sites (2011–15); Air Force radar systems

  • EXEO Group

    Trainborne equipment for 64 trains; video and passenger information systems, Singapore

12

Testing & Commissioning

Inspection, testing, commissioning, handover

RailProvenEXEO Group
Scope and evidence
  • OTDR, insulation and continuity tests
  • Equipment pre-commissioning checks
  • Test support to the systems supplier
  • Test environments and mock-ups
  • Test records and handover files
  • Rail

    Fiber testing and commissioning, MRT-3 (2019–21); balise test support, MRT-3 (2026–); test environment set-up, NSCR (2025–26)

  • Proven

    Testing and commissioning of RAN, DWDM, subsea and radar systems; acceptance tests at air navigation sites

  • EXEO Group

    Full signaling scope, Singapore Downtown Line 3 Extension (2021–25); track circuit system replacement, Singapore

13

Operations & Maintenance

Preventive and corrective maintenance, fault repair

Rail (related work)ProvenEXEO Group
Scope and evidence
  • Preventive inspection of cables and equipment
  • Corrective maintenance and fault repair
  • Emergency response
  • Replacement works on operating lines
  • Maintenance reports
  • Proven

    Outside plant maintenance and emergency repair for PLDT, Globe and ETPI; typhoon restoration (2014–18)

  • EXEO Group

    Maintenance of telecom facilities on all lines of five railway operators, Tokyo area

14

Engineering & Project Support

Survey, drawings, CAD, QA/QC, HSE

RailProvenEXEO Group
Scope and evidence
  • Site surveys and reports
  • Design and installation drawings
  • CAD operators and document control
  • Construction management, QA/QC and HSE
  • Technical manpower for systems suppliers
  • Rail

    Fiber survey, communications design, installation drawings and CAD operators, NSCR (2024–)

  • Proven

    549 projects managed since 1992; CAD and as-built engineering; OSH program under RA 11058

  • EXEO Group

    Group engineering standards; 68 selected railway references (Japan 55, Singapore 13)

EXEO Group references were executed by EXEO Group companies. Client names withheld for confidentiality.

04Delivery experience

Railway project register

Since 2019: ten packages on four rail systems for international contractors — with repeat orders on MRT-3, LRT-1 and NSCR.

PeriodRail system / projectScopeDisciplineClient type
2026–NSCR CP-04 (Malolos–Tutuban)Mainline track bed construction and installation on viaductTrackTrack works subcontractor
2026–MRT-3Balise and impedance bond replacement, with balise test supportSignalingInternational signaling systems contractor
2026MMSP — Philippine Railways InstituteMock-up installation: interlocking, fixed block and railroad modelSignaling · TrackInternational track works contractor
2025–NSCR Mabalacat Depot (N-05)Signaling and communications installationSignaling · TelecomInternational signaling systems contractor
2025MRT-3 UGCS & Taft pocket trackWayside signaling cable laying and termination; LV power cables, UPS for signaling power, groundingSignaling · PowerInternational rail systems contractor
2024–2025MRT-3 Unified Grand Central Station & Taft pocket trackSignaling fiber optic cables, cable trays and cable troughsSignalingInternational rail systems contractor
2024–NSCRFiber backbone survey and site reports, communications design, installation drawings, CAD operators; test environment set-upEngineering · TelecomInternational telecom systems supplier
2023–2024LRT-1 Cavite Extension Phase 1Telecom equipment installation for the new stationsTelecomInternational rail systems contractor
2023LRT-1 Cavite Extension Phase 1Telecom cable trays; power cable trays at traction substation TPS10Telecom · PowerInternational rail systems contractor
2019–2021MRT-3 RehabilitationFiber optic cable restoration: splice closures, OTDR testing — 13 stations and depotTelecomInternational rail systems contractor
2001LRT depot, Pasig3,684 anchor bolts at the maintenance dock, with fabricated frame and gaugeCivilJapanese contractor

Source: MG EXEO project records. Client names withheld for confidentiality; references and certificates available on request. Commercial terms are not disclosed.

05In the field

Railway works in the field

Our crews work in stations, depots, viaducts and on operating lines — at night and to the main contractor's standards.

Wayside signaling works on MRT-3
Wayside signaling works, MRT-3, 2025
Night works on the operating MRT-3 line
Night works on the operating MRT-3 line, 2025
Mock-up installation at the Philippine Railways Institute
Interlocking and fixed-block mock-ups, Philippine Railways Institute (MMSP), 2026
Track bed works on the NSCR viaduct
Track bed works, NSCR viaduct, 2026
Engineers at a site engineering office
Site engineering office, NSCR, 2025
Equipment room fit-out at a depot
Equipment room fit-out, NSCR Mabalacat Depot, 2025

06EXEO Group railway know-how

68 Group railway references in Japan and Singapore

EXEO Group delivers railway power, signaling, telecom and maintenance — know-how that stands behind MG EXEO.

References by domain

  • Telecom44Japan 39 · Singapore 5
  • Signaling13Japan 9 · Singapore 4
  • Maintenance5Japan 5
  • Power4Japan 2 · Singapore 2
  • Trainborne2Singapore 2
EXEO Group railway works in Japan
EXEO Group railway works in Japan
EXEO Group railway works in Japan

EXEO Group railway works in Japan.

DomainWorkCountryPeriod
SignalingFull signaling scope, Downtown Line 3 ExtensionSingapore2021–25
SignalingSignaling renewal: track circuits, point machines, signal equipment roomsSingapore2024–27
SignalingFiber optic installation for CBTC, two subway lines and one commuter lineJapan2020–
Signal & telecomNew operation control center: cables and equipmentJapan2019–21
TelecomTrain radio (LCX) renewalJapan2020–25
Telecom5G mobile sharing system; Wi-Fi at all stationsJapan2012–24
PowerUPS replacement at 40 subway stationsJapan2020–23
PowerSubstation facilities, AC/DC converters, 22 kV power cablesSingapore2020–22
MaintenanceTelecom facility inspection and emergency repair, all lines of five operatorsJapan2020–
TrainborneVehicle equipment installation, 64 trainsSingapore2020–25

Source: EXEO Group railway project reference list (January 2026). Selected references, executed by EXEO Group companies. Client names withheld for confidentiality.

07Delivering a new scope

How we take on a new railway scope

When a scope is new to us, we control the risk in five steps — the same path that took us from fiber on MRT-3 to signaling, power and track works.

  1. 1Prepare
    • Review scope, interfaces and methods with the systems supplier
    • Draw on EXEO Group references, standards and expertise

    Evidence68 selected Group railway references; Group engineering standards

  2. 2Train
    • Train the crew at our center before mobilization
    • Practise on mock-ups for new equipment

    EvidenceTraining center since 2017; railway telecom training with EXEO Group (2017)

  3. 3Partner
    • Add a licensed specialist where the scope needs one
    • MG EXEO stays your single point of contact

    Evidence69 kV substation upgrade with AsiaPhil (2025–)

  4. 4Execute
    • Install to the supplier's drawings, inspection plans and safety rules
    • Daily reports, toolbox meetings, permits to work

    Evidence10+ rail packages for international contractors since 2019

  5. 5Commission
    • Test, document and hand over with the supplier
    • Stay on for maintenance and support

    EvidenceFiber testing and commissioning, MRT-3 (2019–21); balise test support (2026–)

08Ways we work

We fit the way each package is let

Installation services

For systems suppliers

  • Install, terminate and test to the supplier's drawings
  • Client-supplied equipment and materials: receiving, hauling, storage

EvidenceMRT-3 fiber restoration (2019–21); LRT-1 station telecom (2023–24); NSCR depot signaling and communications (2025–)

Works packages

Defined scope, our own crews

  • A defined package with our own labor, tools and supervision
  • Measured or lump-sum terms; our own QA/QC and safety

EvidenceMainline track bed on the NSCR viaduct (2026–); mock-ups at the Philippine Railways Institute (2026)

Engineering & technical support

Survey, design, drawings, testing

  • Site surveys, design and installation drawings
  • CAD operators, test environments and test support

EvidenceNSCR communications design, drawings and CAD operators (2024–); balise test support, MRT-3 (2026–)

Single point of contact

With specialist partners

  • MG EXEO holds the contract and the interfaces
  • Licensed specialist partners for special scopes

Evidence69/13.2 kV substation upgrade with AsiaPhil (2025–); EXEO Group railway know-how in Japan and Singapore

Invite MG EXEO to your next railway package

Power, signaling, telecom, track, civil or support works — capability and evidence documents are ready on request.